Programme controls for construction and infrastructure

Programme reporting you can cite.

BIDashboard takes your Primavera P6 schedules and turns them into schedule assurance, commercial registers and issued report packs — with every figure traceable to the snapshot and the settings that produced it.

Q1Q2Q3 Q4Q1Q2 Enabling works Substructure Superstructure Fit-out and MEP Commissioning Data date
Baseline Current Critical — hatched, not just coloured Data date Illustration, not project data.

One place for the programme, from the XER to the issued pack.

Upload a P6 export and it becomes a dated snapshot. Everything below reads from those snapshots, so last month's answer is still there next month.

Schedule

Gantt

A virtualised Gantt built for programmes with tens of thousands of activities, grouped by your own code structures rather than by whatever P6 happened to call them, with PDF and Excel export.

Schedule

Health

DCMA 14-point and extended checks, measured against thresholds you set. Those thresholds belong to the project, not to whoever's browser is open.

Schedule

Compare

What changed between two updates, the finish first — dates, durations, float, logic, added and deleted work, and what moved on P6's own driving path — with tolerances you control.

Schedule

Milestone trends · Adherence

Milestone movement across every update, in working days on each milestone's own calendar, and adherence that states its own rule rather than implying one.

Schedule

Risk analysis

Monte Carlo on the programme itself, seeded so that a result can be reproduced instead of merely re-run.

Reports

Milestone status · Progress vs plan · Planning reliability · Cost

Where the milestones stand, progress against plan by whichever breakdown the project uses, Percent Plan Complete measured as commitments met, and cost against budget.

Reports

Report packs

Compose a pack from the same analysis you reviewed on screen, issue it, and keep the record of what was issued, when, and what was left out.

Registers

Delay events · Change events

Delay events reconciled against the programme's own finish movement, and change events with their contractual clocks running, so a notice approaching its time bar is visible before it lapses.

Registers

Risks · Progress proposals · Documents

A scored risk register, site progress proposed against the programme and approved by someone other than its author, and a document register with its full revision chain.

Built the way a controls team would audit it.

Want to see it on your programme?

BIDashboard is invitation-only while it is rolled out project by project. Get in touch and we will set up a workspace.